问题如下:
ERM looks at an integrated view of
选项:
A. market and credit risks only
B. all the risks covered by Basel Ill
C. all the risks, including business risk, strategic risk, and
liquidity risk
解释:
B is correct. required of all relevant banks over an asset threshold.
CCAR is conducted at the end of the year for banks with assets above USD 50 billion.
老师好,这道题正确答案应该是C。