问一道题:NO.PZ2020042003000076

问题如下:

The following statements are about the key health measures of a CFP framework, which of the following statements is NOT correct?

选项:

A.

Projected net funding requirements to current unused funding capacity: assess the bank’s future lending obligations to the total funds available.

B.

Funding maturity profile: Large concentrations in funding maturities can threaten an institution’s liquidity position, particularly concentration in short-term funding.

C.

Overnight borrowings to total assets: The use of this volatile source of funding can expose the institution to increased liquidity risk.

D.

Short-term liabilities to total assets: the funding will need to be repaid within a predetermined short-term time period to support the institution’s assets.

解释:

考点:对Contingency Funding Planning-Framework and Building Blocks的理解

答案:D

解析:

D选项描述错误,Short-term liabilities to total assets是衡量要在短期内Roll overFunding,不是Repaid。关于D选项正确的表述为:

Short-term liabilities to total assets: the funding will need to be rolled over within a predetermined short-term time period to support the institution’s assets.

A这句话是什么意思呢

1 个答案
已采纳答案

小刘_品职助教 · 2020年11月08日

同学你好,

A选项其实评估是未来的义务(即给出了授信但是客户尚未提取的部分)与当前自己的可用资金(从流动性角度的考虑)之间的比值。

对应的是 Framework and Building Blocks老师讲课 1.5倍速 9分半左右。

 

  • 1

    回答
  • 0

    关注
  • 618

    浏览
相关问题

NO.PZ2020042003000076 问题如下 The following statements are about the keyhealth measures of a CFP framework, whiof the following statements is NOTcorrect? Projectenet funng requirements to currentunusefunng capacity: assess the bank’s future lenng obligations to thetotfun available. Funng maturity profile:Large concentrations in funng maturities cthreaten institution’sliquity position, particularly concentration in short-term funng. Overnight borrowings to totalassets: The use of this volatile sourof funng cexpose the institutionto increaseliquity risk. Short-term liabilities to totassets: thefunng will neeto repaiwithin a pretermineshort-term time periotosupport the institution’s assets. 考点对ContingenFunng Planning-FrameworkanBuilng Blocks的理解答案析述错误,Short-termliabilities to totassets是衡量要在短期内Roll over的Funng,不是Repai关于确的表述为Short-term liabilities to totassets: thefunng will neeto rolleover within a pretermineshort-term timeperioto support the institution’s assets. Short-term liabilitie 是要短期内repai呀,一定要表述成roll over吗

2023-08-01 16:58 1 · 回答

NO.PZ2020042003000076 1、net-funng-requirements的fun应的是客户的funng对吗 2、然后current unusefunng capacity是指银行自己的funng对吗,两者fun主体不同?

2021-05-03 11:32 1 · 回答

Funng maturity profile:Large concentrations in funng maturities cthreaten institution’sliquity position, particularly concentration in short-term funng. Overnight borrowings to totalassets: The use of this volatile sourof funng cexpose the institutionto increaseliquity risk. Short-term liabilities to totassets: thefunng will neeto repaiwithin a pretermineshort-term time periotosupport the institution’s assets. 考点对ContingenFunng Planning-FrameworkanBuilng Blocks的理解 答案解析 述错误,Short-termliabilities to totassets是衡量要在短期内Roll over的Funng,不是Repai关于确的表述为 Short-term liabilities to totassets: thefunng will neeto rolleover within a pretermineshort-term timeperioto support the institution’s assets. 请问C在讲义哪一页有讲到

2020-10-25 16:11 1 · 回答

这个是在S8里的哪个PPt的内容啊,做错了好几次了这个题

2020-10-12 22:32 1 · 回答